Top searched
Results (0)
Reconstruction is finished, the swimming pool welcomes visitors

The Petynka swimming pool opens today! 30 million were spent on its new look

Karolína Lišková
17.Jul 2020
+ Add on Seznam.cz
1 minute

Finally! Although the weather isn't exactly inviting, Prague's Petynka Swimming Pool is welcoming its first guests. It may have opened with a 1-month delay due to the coronavirus, but its new look more than makes up for that. Since February, work has been underway in its premises not only on the new swimming pool, but also on the facilities. Everything shines like new here. The reconstruction cost about 30 million crowns.

Ještě loni to na Petynce vypadalo takhle.
Všechno staré muselo pryč.
V areálu se zdržovala těžká technika.

The gates opened to visitors with great glory today, July 17, at seven o'clock in the morning. Incoming people will immediately notice a brand new pool, tiles, waders, benches, a place for sunbathing or a pool under the water slide.

Imported from Italy

“The pool had to be renovated because the foil there was already very old. Once it was removed, the whole bottom had to be concreted and new foundation laid. The stainless steel strips that came on top were imported from Italy, so the whole reconstruction was delayed due to the coronavirus pandemic, we had to wait for the borders to open,"

the head of the complex, Ondřej Renský, explained to LP-life.cz, adding that heavy equipment was also employed in the premises. The 50-meter pool tub cost a little under 27 million crowns, and another four million were needed to repair the facilities.

Pronájem luxusního bytu 3+kk Pařížská, Praha
Pronájem luxusního bytu 3+kk Pařížská, Praha, Praha 1

Open in gallery (3)
Materiál byl dovezen až z Itálie.
Materiál byl dovezen až z Itálie. Source: archiv Koupaliště Petynka facebook.com/koupalistepetynka/

The facilities were revamped too

The showers, toilets and changing rooms also underwent complete revitalization.

"Everything is new, replaced, the air conditioning hidden in the ceiling, I think visitors will certainly notice and appreciate it,"

Rensky hopes.

Open in gallery (3)
Zrekonstruovaný je i bazének pod tobogánem.
Zrekonstruovaný je i bazének pod tobogánem.Source: archiv Koupaliště Petynka facebook.com/koupalistepetynka/

Although the reconstruction costs were higher than 30 million crowns, the entrance fee will reportedly remain the same, i.e. 160 crowns for the whole day. Seniors over 70 from Prague 6 have free entry, and so do children under the age of three. This season, the visitors can look forward to all forms of entertainment, such as an aquazorbing pool or ping-pong tables.

There's a small catch though: the capacity of the object. According to government regulations, no more than a thousand people can enter the complex at once. Therefore, if you want to enjoy this luxury bathing, it's a good idea to check the online capacity of the swimming pool before you head there.

"We are really looking forward to when Petynka opens, the kids can hardly wait. We live nearby and commuting to another swimming pool is a bother,"

said the mother of two children on maternity leave, adding that she was very curious how the reconstruction worked out.

Open in gallery (3)
Nový bazén i s dlažbou kolem.
Nový bazén i s dlažbou kolem. Source: archiv Koupaliště Petynka facebook.com/koupalistepetynka/

Did you like the article?
Discussion 0 Enter discussion
Koupaliště Petynka
Otevřená 1072/4, Praha 6 – Střešovice
235 094 068